1000 MW Naying Hydro Electric Project
| Date of LOI |
March 2006 |
| Capacity |
1000 MW |
| Generation |
4966.77 million units per annum |
| Nature of Contract |
BOT |
| Concession Period |
40 Years |
| Investment |
INR 50,000 Million |
The Naying Hydro Electric Project will be constructed on the Siyom River in West Siang District of Arunachal Pradesh at an approximate cost of Rs. 5,000 crores through a SPV. The Project Cost anticipated as per Pre Feasibility Report is Rs. 3,100 crores.
The SPV will have 89% equity participation by DSCL and 11% equity participation by the State of Arunachal Pradesh. The Company has already started the process of preparation of the Detailed Project Report and subsequently the construction work on this project will be completed over a period of 8 years. The concession period for the project is 40 years. Under the contract, 12% of the power is to be given free to the State of Arunachal Pradesh for the first 5 years, 14% for the 6th to 10th years, 19% for 11th to 15th years and 18% for the remaining period. DSCL can sell the remaining power to any State in India.
260
MW Kutehr Hydro Electric Project
| Date of LOI |
January 2007 |
| Capacity |
260MW (3 X 86.67 MW) |
| Generation |
1075.26 GWH |
| Nature of Contract |
Independent Power Producer |
| Concession Period |
40 years |
| Investment |
INR 10,582 Million |
The company has recently emerged as a successful Independent Power Producer by winning the bid to develop, construct and operate the Kutehr Hydro Project (260 MW) in the State of Himachal Pradesh amongst stiff competitive bidding by 8 National and International players. DSC Limited has made a bid for an up-front payment of INR 5.2 Million per MW for this project, which is the largest upfront payment made in the country for a hydroelectric project till date.
The Company has already started the process of preparation of the Detailed Project Report and subsequently the construction work on this project will be completed over a period of 7 years from date of financial closure. The concession period for the project is 40 years. Under the contract, 12% of the power is to be given free to the State of Himachal Pradesh for the first 12 years, 18% for the 13th to 30th year, 30% for 31st to 40th year. DSCL can sell the remaining power to any State in India.
Located in the Chamba district of Himachal Pradesh, the Kutehr Hydel Project has been envisaged with the purpose of exploiting the potential in the upper reaches of Ravi River. The project involves the construction of a barrage across Ravi river about 4 Km downstream of Holi Village, a head regulator, a desilting basin to divert power draft of 109 cumecs through a 15.00 Km long head race tunnel ending in a 18 mtr diameter surge shaft, one pressure shaft of 4.80 mtr dia, tribifurcating further to generate 260 MW (3 X 86.67 MW) of power in an underground power house near village Suhaga about 1 km upstream of Kharamukh village.
It is proposed that the power generated from the project will be transmitted through a 400 KV double circuit transmission line at a cost of INR 45 cr apx which will be 23 Km long from Kutehr power house to Hibra (Chamera III) power.
|